INTERNAL / PRIVILEGED — DRAFT
Protest 021: SKA-0320 Fish Passage Streambed Material Gradation
Contract 9727 — I-405, Brickyard to SR 527 — Asserted $530,421.40 (Design-Builder total, design only) via Skanska LTR 476-479. Construction and schedule reserved. Four per-crossing Written Determinations due 7/30/26.